Facade Painting & Anti-Carbonation Coating
Long-life weather-shield and anti-carbonation exterior coatings, applied safely at any height with strict DFT checks.
When does your building need this?
A facade repaint is the largest visible job most societies do, and it only lasts if the preparation is right. We repair cracks and damp areas first, then apply a coating system matched to NCR heat, dust and monsoon, with thickness checks on every coat.
- Faded, chalky or peeling exterior paint
- Black or green fungus streaks
- Fine cracks across large wall areas
- Damp inner walls after rain
- Previous paint job failed within two or three years
Why it happens, and why the quick fix fails
Most early paint failures come from painting over cracks and damp plaster, skipping the primer, or applying coats too thin. The coating looks fine on day one and fails after the first monsoon.

Technical workflow
Every stage is logged with photos and shared with your RWA or estate manager.
- STEP 01
Jet-wash preparation
High-pressure jet washing removes dust, fungus and loose paint.
- STEP 02
Repairs first
Cracks are V-grooved and filled, and hollow or damp plaster is repaired before any coating.
- STEP 03
Primer
One coat of suitable primer for adhesion and alkali resistance.
- STEP 04
Two finish coats
Two coats of weather-shield or anti-carbonation finish, with wet film thickness checked as work goes on.
- STEP 05
DFT check and handover
Dry film thickness is verified against the manufacturer specification before sign-off.
Approved material systems
Factory-sealed branded materials, with technical data sheets submitted before work starts. Final selection depends on the audit.
| Application area | Recommended system | Key technical benefit | Approved brands |
|---|---|---|---|
| Exterior walls | Weather-shield exterior emulsion | Long-life colour and dirt resistance | Asian Paints SmartCare / equivalent |
| Concrete surfaces | Anti-carbonation coating | Slows carbonation that leads to rebar corrosion | SikaGard / equivalent |
| Cracked facades | Elastomeric acrylic coating | Bridges hairline cracks | Dr. Fixit Raincoat / SikaGard |
Common questions
How often should a society repaint?
It depends on the system and exposure. With proper preparation and a quality system, repainting intervals become much longer.
Do we need bamboo scaffolding for a 15 to 25 floor tower?
No. We use certified double-rope access systems and motorized suspended cradles. This avoids security risks, protects resident privacy, keeps ground parking open and cuts setup time significantly.
Can the work be done while residents are living in the flats?
Yes. Exterior wall, shaft and facade work is done from outside, so flat access is not needed. Daily work is scheduled to keep noise and disturbance low.
What is the best season for high-rise waterproofing?
The dry months before the monsoon (February to May) and after it (September to November) give the best adhesion. Emergency leak-arrest work can be done year-round.
Not sure this is the right fix? Our free audit finds the cause first, then we recommend the system.
Book a free site auditNeed facade painting & coating for your building?
Our team maps the moisture and cracks, finds the root cause and gives your committee a written BOQ before any work starts.

