Projects

Proven high-rise civil & MEP execution across Delhi NCR

Every project is documented the same way: building specs, the challenge, the root cause, the system used, the timeline and safety record, and the verified outcome.

Typical scopes

The jobs we take on

Detailed case studies with real site photos are being added. Until then, these are the typical scopes and systems for each kind of job. Ask us for site photos from similar buildings during your audit.

Waterproofing
TYPICAL SCOPE

High-rise society facade waterproofing

Building
14 to 25 floor residential towers
Challenge
Monsoon seepage on upper floors through plaster cracks and failed joints
System
V-groove + PU sealant, primer and 2-coat elastomeric membrane
Sign-off
Hose test on vertical faces before demobilization
How we do it →
Waterproofing
TYPICAL SCOPE

Terrace and shaft leak rehabilitation

Building
Top floors, terraces and plumbing shafts
Challenge
Ceiling leaks in top-floor flats and damp shaft walls
System
PU liquid membrane with UV coat; shaft crack injection
Sign-off
Ponding test on horizontal surfaces
How we do it →
Structural Repair
TYPICAL SCOPE

Balcony RCC spalling and exposed rebar

Building
Balcony slabs, beams and chajjas
Challenge
Falling concrete chunks and corroded reinforcement
System
Rust converter, epoxy bonding coat, PMM / micro-concrete
Sign-off
Hammer-sound and adhesion checks
How we do it →
Plumbing & Shafts
TYPICAL SCOPE

Vertical shaft riser & stack replacement

Building
15 to 25 floor towers with shared bathroom shafts
Challenge
Damp bathroom walls from rusted GI risers and cracked SWR joints
System
SDR-11 CPVC risers, Type-B SWR stacks, SS clamps + shaft waterproofing
Sign-off
Hydrostatic pressure test at 1.5× working pressure
How we do it →
Electrical & MEP
TYPICAL SCOPE

LT panel overhaul & earthing upgrade

Building
Main LT room and floor sub-distribution panels
Challenge
Overheating busbars, nuisance tripping, high earth resistance
System
Busbar torquing, genuine MCCBs, APFC upgrade, chemical earth pits
Sign-off
Thermography re-scan, Megger test and signed report
How we do it →
Facade Painting
TYPICAL SCOPE

Anti-carbonation repaint of a society

Building
Full exterior of multi-tower societies
Challenge
Faded, chalking paint and hairline cracks
System
Jet-wash prep, 1 primer + 2 finish coats with DFT checks
Sign-off
Thickness log and committee walk-through
How we do it →
Structural Repair
TYPICAL SCOPE

Expansion joint between twin towers

Building
Movement joints between towers and blocks
Challenge
Active leakage through a torn joint
System
Joint cleaning, backer rod, primer, PU / polysulphide sealant + tape
Sign-off
Water test across the joint
How we do it →
Commercial & Glazing
TYPICAL SCOPE

Glass and ACP facade re-sealing

Building
IT parks and commercial towers
Challenge
Leaks at glazing joints and open ACP seams
System
Remove failed sealant, neutral-cure weatherproof silicone
Sign-off
Spray test, off-hour execution for tenants
How we do it →
Electrical & MEP
TYPICAL SCOPE

Thermographic safety audit for an RWA

Building
Residential towers with lifts, pumps and DG backup
Challenge
Unknown hot spots in rising mains and meter rooms
System
Infrared scan, load balance check, earth-pit Megger test
Sign-off
Prioritized fix list with photos for the committee
How we do it →
Case study format

What every Sealspire case study records

The same record your committee receives at handover.

01

Building specs

Floors, towers, shafts or panels, and facade area in square feet.

02

The challenge

What residents or tenants were facing, and where.

03

Root-cause diagnosis

Why it was happening, from moisture, thermal or pressure diagnostics.

04

Solution & materials

Access method, preparation and the branded systems used.

05

Timeline & safety

Days on site, incidents, shutdown windows, and how disruption was avoided.

06

Verified outcome

Water, pressure or load test results and the written warranty issued.