PU Injection Waterproofing
Non-destructive high-pressure polyurethane (PU) injection grouting for bathrooms, shafts, terraces and basements.
When does your building need this?
Seepage from a bathroom above, a plumbing shaft or a terrace damages ceilings and grows fungus. The usual answer is to break all the tiles. In many cases that is not needed: high-pressure PU injection seals the water path inside the concrete itself.
- Damp patches on a ceiling below a bathroom
- Paint bubbling near shafts and ducts
- White salt deposits on walls
- Musty smell and fungus spots
- Seepage that worsens after water use or rain
Why it happens, and why the quick fix fails
Water travels through fine cracks, construction joints and gaps around pipes, often some distance from where the stain appears. That is why we trace the source with moisture meters before injecting.

Technical workflow
Every stage is logged with photos and shared with your RWA or estate manager.
- STEP 01
Find the source
Moisture mapping traces where water is entering.
- STEP 02
Fix injection ports
Small packers are fixed along the crack or joint line, usually without lifting tiles.
- STEP 03
High-pressure injection
PU resin is pumped in, reacts with moisture, expands and seals the crack network.
- STEP 04
Seal and restore
Ports are removed, holes sealed, and damaged finishes repaired once dry.
Approved material systems
Factory-sealed branded materials, with technical data sheets submitted before work starts. Final selection depends on the audit.
| Application area | Recommended system | Key technical benefit | Approved brands |
|---|---|---|---|
| Active seepage | Hydrophobic / hydrophilic PU grout | Expands in contact with water to seal leaks | Approved PU grout systems |
Common questions
Will you need to break my tiles?
For suitable seepage conditions, no. We confirm after inspection.
What does the written warranty cover?
Material adhesion, resistance to film cracking, and waterproofing performance against seepage in all treated areas, backed by a formal QA/QC sign-off sheet. The period depends on the system used and is stated in the proposal.
Not sure this is the right fix? Our free audit finds the cause first, then we recommend the system.
Book a free site auditNeed pu injection waterproofing for your building?
Our team maps the moisture and cracks, finds the root cause and gives your committee a written BOQ before any work starts.

