1. Home
  2. Services
  3. Terrace waterproofing

Terrace Waterproofing & Hollow Tile Repair

Seamless PU or elastomeric membranes with UV protection, and under-tile resin injection for hollow floor tiles.

Access methodRope access / cradle
Execution timeProject-based, after audit
WarrantyUp to 10 years, written
Key specPonding test before sign-off
Warning signs

When does your building need this?

Top-floor ceilings leak because terrace waterproofing has aged, cracked or was never complete. We seal the weak points first, then lay a seamless membrane and test it with ponding before handover.

  • Dripping top-floor ceilings in the monsoon
  • Water ponding after rain
  • Cracked or blistered old layers
  • Leaks around outlets, parapets and tank bases
  • Hollow-sounding or lifting floor tiles
Root cause

Why it happens, and why the quick fix fails

Tar felt and bitumen harden and crack in the sun, and joints at parapets, pipes and outlets open up. Most terrace leaks start at these details.

Typical quick fixTar felt or bitumen layer
Sealspire methodSeamless PU membrane with UV coat and ponding test
Standard operating procedure

Technical workflow

Every stage is logged with photos and shared with your RWA or estate manager.

  1. STEP 01

    Survey

    Slopes, outlets, joints and existing layers are checked.

  2. STEP 02

    Detailing

    Parapet corners, pipe penetrations and outlets are sealed and reinforced first.

  3. STEP 03

    Membrane

    A seamless PU or elastomeric liquid membrane is applied in multiple coats.

  4. STEP 04

    UV coat and ponding test

    A UV-stable topcoat goes on and the terrace is ponding-tested before sign-off.

Specification

Approved material systems

Factory-sealed branded materials, with technical data sheets submitted before work starts. Final selection depends on the audit.

Application areaRecommended systemKey technical benefitApproved brands
Terraces & slabsPU liquid membraneSeamless, UV-stable, high hydrostatic resistanceSikaFill / Fosroc Nitoproof
Hollow tilesUnder-tile polymer resin injectionRe-bonds tiles without demolitionApproved resin systems
FAQs

Common questions

What is the best season for high-rise waterproofing?

The dry months before the monsoon (February to May) and after it (September to November) give the best adhesion. Emergency leak-arrest work can be done year-round.

What does the written warranty cover?

Material adhesion, resistance to film cracking, and waterproofing performance against seepage in all treated areas, backed by a formal QA/QC sign-off sheet. The period depends on the system used and is stated in the proposal.

Not sure this is the right fix? Our free audit finds the cause first, then we recommend the system.

Book a free site audit
Free site audit

Need terrace waterproofing for your building?

Our team maps the moisture and cracks, finds the root cause and gives your committee a written BOQ before any work starts.