Terrace Waterproofing & Hollow Tile Repair
Seamless PU or elastomeric membranes with UV protection, and under-tile resin injection for hollow floor tiles.
When does your building need this?
Top-floor ceilings leak because terrace waterproofing has aged, cracked or was never complete. We seal the weak points first, then lay a seamless membrane and test it with ponding before handover.
- Dripping top-floor ceilings in the monsoon
- Water ponding after rain
- Cracked or blistered old layers
- Leaks around outlets, parapets and tank bases
- Hollow-sounding or lifting floor tiles
Why it happens, and why the quick fix fails
Tar felt and bitumen harden and crack in the sun, and joints at parapets, pipes and outlets open up. Most terrace leaks start at these details.

Technical workflow
Every stage is logged with photos and shared with your RWA or estate manager.
- STEP 01
Survey
Slopes, outlets, joints and existing layers are checked.
- STEP 02
Detailing
Parapet corners, pipe penetrations and outlets are sealed and reinforced first.
- STEP 03
Membrane
A seamless PU or elastomeric liquid membrane is applied in multiple coats.
- STEP 04
UV coat and ponding test
A UV-stable topcoat goes on and the terrace is ponding-tested before sign-off.
Approved material systems
Factory-sealed branded materials, with technical data sheets submitted before work starts. Final selection depends on the audit.
| Application area | Recommended system | Key technical benefit | Approved brands |
|---|---|---|---|
| Terraces & slabs | PU liquid membrane | Seamless, UV-stable, high hydrostatic resistance | SikaFill / Fosroc Nitoproof |
| Hollow tiles | Under-tile polymer resin injection | Re-bonds tiles without demolition | Approved resin systems |
Common questions
What is the best season for high-rise waterproofing?
The dry months before the monsoon (February to May) and after it (September to November) give the best adhesion. Emergency leak-arrest work can be done year-round.
What does the written warranty cover?
Material adhesion, resistance to film cracking, and waterproofing performance against seepage in all treated areas, backed by a formal QA/QC sign-off sheet. The period depends on the system used and is stated in the proposal.
Not sure this is the right fix? Our free audit finds the cause first, then we recommend the system.
Book a free site auditNeed terrace waterproofing for your building?
Our team maps the moisture and cracks, finds the root cause and gives your committee a written BOQ before any work starts.

